Voltech Logo 中文 | Not logged in (login) | View cart | Contact us   
Contents
Home
Transformer testers
AT3600
ATi
DC1000
Accessories
Fixturing
Power analyzers
PM6000
PM3000
PM300
PM1000+
Accessories
Product service
Request service
Track service order
Order rental instruments
Technical support
Knowledge base
Technical articles
User manuals
Software/firmware
Applications support

 
 
 
 AT3600 High Voltage Transformer Tester
Superior by design, the AT3600, with its patented digital measurement techniques, has revolutionized transformer testing throughout out the world. Only the AT3600 combines high and low voltage testing in one station to provide this combination of speed, accuracy, flexibility and reliability.
AT3600  From $18,360.00 Help
High Voltage Transformer Tester
Estimated Lead Time: 28 days Help
Add to Cart
AT3600 Demonstation
Rep and Self -Demo Systems Available
Estimated Lead Time: 3 days
Request

Need a rental? Click here for information.

Tests: STRW - Stress Watts   Back To Tests

Price: $549.00
Add to Cart

Where Used

The Stress Wattage test tests the transformer for breakdown of insulation by measurement of the energising power of a winding, usually the primary, with the remaining windings open circuit. This test applies the voltage, usually twice the normal operating voltage, and continually measures the power to determine any breakdown by changes in the measurement.

This test is suitable for sub-miniature line frequency, large line frequency bobbin wound and some HF transformers. It checks the integrity of interturn insulation, the magnetic material and joints.

Measurement Conditions

A constant voltage source is applied to the winding under test. Both the rms voltage and the power are measured. If necessary, the voltage can is trimmed to the user specified value, and the measurement repeated. The measurement is repeated many times until the dwell time has elapsed. The result given is the measured power.

Usually, the energization is at twice the working voltage and frequency, and has the purpose of trying to create an inter-turn breakdown at a point of potential weakness in the wire enamel. This breakdown is detected by an increase in the measured power.

Details
Overview
Benefits
Cost Savings
Tests
Fixturing
Applications
What's In the Box?
Software
 
More Information
Brochure
User Manual
Technical Articles

© 2006-2009 Voltech Instruments, Inc.   Terms and conditions | Terms of use | Privacy statement | About Voltech | Contact webmaster | Website help | Contact us
Credit card processing